Enhanced TDS
Knowde-enriched technical product data sheet
Identification & Functionality
- Chemical Family
- Polymer Name
- Technologies
- Product Families
Features & Benefits
- Materials Features
Applications & Uses
- Markets
- Applications
- Plastics & Elastomers Processing Methods
- Appliation Details
CURE SCHEDULE/HEAT CURING:
Most of the physical properties can be achieved in 5-7 days at 77ºF (25ºC). You may use your own post-cure schedule but the physical properties may vary from BJB’s cure schedule of 1-3 hours at 77ºF (25ºC) followed by 16 hours at 160ºF (71°C). Do not exceed curing temperatures of 200ºF (93ºC). Support of the part may be required to prevent part deformation during the heat curing process.If you are using heat to accelerate the demold time, allow the part to cool down to ambient temperature before demolding.
Properties
- Physical Form
Safety & Health
- Safty Precaution
Avoid contact with skin using protective gloves and protective clothing. Repeated or prolonged contact on the skin may causean allergic reaction. Eye protection is extremely important. Always use approved safety glasses or goggles when handling this product. Use in well-ventilated areas. Avoid breathing vapors. If exposures cannot be kept at a minimum, a respirator may be necessary in addition to ventilation. The use of a positive pressure air supplied respirator is mandatory when airborne isocyanate concentrations are “not known” or exceeds OSHA TWA of 0.005 ppm. Air purifying, organic cartridge type respirators are not generally recommended to use when handling this material without implementation of an end of life service program. Observe OSHA regulations for respirator use (29 CFR 1910.134). Employers are responsible for selecting the correct respirator for each situation.
Packaging & Availability
- Packaging Type
Storage & Handling
- Storage
Store at ambient temperatures, 65-80ºF (18-27ºC). Unopened containers will have a shelf life of 6 months from date of shipment when properly stored at recommended temperatures. Purge opened containers with dry nitrogen before re-sealing.